Edmonton's Citizen Dashboard

Close
Author
mandella
Description
Over the past 10 years, LRT boardings have grown by 132.5%. The City aims to continue its expansion of the LRT network. The Southeast to West LRT (Valley Line) is a low-floor urban line that will run from Mill Woods to Lewis Farms, crossing through downtown.
Category
Dashboard
Tags
twwg, the way we green, lrt ridership, dashboard
Rating
Current value: 0 out of 5
This view cannot be displayed
This view is currently private. You can preview it, but you will need to make it public before people will be able to see it.
Size
  • 500x425

  • 760x646

  • 950x808

Custom Size

425x425 is the minimum size

The Socrata Open Data API (SODA) provides programmatic access to this dataset including the ability to filter, query, and aggregate data. For more more information, view the API docs for this dataset or visit our developer portal

API Endpoint:

Field Names:

ID
id
YEAR
year
LRT passengers daily
actual_data

Use OData to open the dataset in tools like Excel or Tableau. This provides a direct connection to the data that can be refreshed on-demand within the connected application.

Socrata OData documentation

Tableau users should select the OData v2 endpoint option.

OData V4 Endpoint:

OData V2 Endpoint:

You are viewing a mobile version of this dataset. To access the full dataset, tap here.